On Friday, the installers of the solar panels completed their work to connect the new panels to our power system. Puget Sound Energy then came to reconnect power to the grid.
The two final needs are an inspection by the Fire Department, which is scheduled for Monday, September 30. Then a representative from Puget Sound Energy needs to do their final sign-off of the entire project.
Watch for an announcement of a celebration party when all is completed!